Project Details
10,200 SF – New Construction
- Demolition of existing 15k SF pool, pool site 30k SF decking and equipment room.
- 5,400 SF Main Competition Pool with stainless steel gutter, diving board, starting platforms, slide and handicap lift.
- River Circle Pool, center island palm tree and handicap lift.
- 2,800 SF wading pool with 5 features.
- New filter building, Neptune Benson Filters, pumps, VFDs and Chemical Controls.
- Exterior Improvements – 2 playground areas with safety surfaces, shuffle board, ball toss, 30,000 SF new concrete deck, handicap ramp with rails, deck and trench drains.
- Electrical Work – connection to emergency transformer, new stepdown transformers, main distribution panels, Equipment Room lighting, pool lighting and new site lighting.
- 12″ storm drain lateral 300 ft run to manhole.
Project Completed May 2015
Project Disciplines
General Construction
Concrete
Earthwork
Electrical
Plumbing
Pool Construction
OWNER:
Township of Springfield
ADDRESS:
400 W. Sproul Road
Springfield, PA 19064