Project Details
The work required partial demolition of the existing mechanical, hydronic, roof top condensing units, VAVs and finned tube radiation, electrical systems, supporting ductwork, piping, electrical and controls. New work included installation of a Packaged Rooftop Unit, supporting ductwork, piping, VAVs electrical and controls. Structural steel support for new RTU, replacement of all suspended ceiling systems and repair of walls associated with installation of new mechanical system.
Project Disciplines
General Construction
Carpentry
Painting
Controls
Electrical
Mechanical
Mechanical Insulation
Plumbing
OWNER:
Defense Logistics Agency
ADDRESS:
DLA Distribution Susquehanna New Cumberland, PA 17070
ARCHITECT:
Base Engineers