Project Details
Fast track Design-Replacement Project – Demolition and replacement of 9 filtration systems in 3 different mechanical rooms including the installation of 35 pumps, 9 chemical control systems and 9 building-integrated pool heating systems. Epoxy lined approximately 12,000 linear feet of stainless steel pipe within 10 stories of the building.
Project Disciplines
Mechanical
Electrical
Plumbing
Pool Construction
OWNER:
AC Ocean Walk
ADDRESS:
500 Boardwalk
Atlantic City, NJ 08401