Project Details


Fast track Design-Replacement Project – Demolition and replacement of 9 filtration systems in 3 different mechanical rooms including the installation of 35 pumps, 9 chemical control systems and 9 building-integrated pool heating systems.  Epoxy lined approximately 12,000 linear feet of stainless steel pipe within 10 stories of the building.

Project Disciplines

Mechanical
Electrical
Plumbing
Pool Construction

OWNER:

AC Ocean Walk

ADDRESS:

500 Boardwalk
Atlantic City, NJ 08401

ARCHITECT: