Project Details

 13,400 SF New Pool

  • Demolition of perimeter pool tunnel, sections of existing pool shell, existing equipment room.
  • Installation of new pool withing existing pool foot print, double mat #5 rebar/8″ OCEW below 3ft and #5 rebar single mat #5 rebar/8″ OCEW less than 3 ft.
  • Handicap ramp at Zero entry.
  • Gunite walls and floor, plaster, tile and coping.
  • New pool plumbing, pumps, soft starts and chemical controls.
  • Installation of 9 features in tot pool and intermediate pools
  • Double flume tube slide and drop slide.
  • 2 Rock climbing walls.
  • Umbrellas around pool perimeter.
  • Exterior Improvements – Installation of frost proof deck hydrants, electrical bollards around pool perimeter, 12K SF reinforced decking and deck trench drains.
  • Electrical – Alteration of existing electrical system to meet code for 100 year flood plain.

Project Completion October 2017

Mack Pool 

  • Demolition of equipment room.
  • Installation of new filters, pumps, pipes and valves.
  • Installation of New concrete ramp into side of mechanical room.  
  • Install overhead door in existing brick wall.

Project Completed May 2016